BERKE HEPP (3x174 MW)

BERKE HEPP (3x174 MW)

Mechanical Erection, test and commissioning support of turbines (including embedded parts), butterfly inlet valves and generators, designed and manufactured by ALSTOM Power Hydro and ALSTOM Power Hydraulique, as member of consortium with ALSTOM Power.

Other Works in the Scope of This Project

Mechanical Manufacturing of turbine draft tubes,spiralcases,distributors and some generator components designed by ALSTOM POWER Hydraulique (GEC-ALSTHOM / Belford - FRANCE).

Mechanical Manufacturing of some turbine components designed by ALSTOM POWER Hydro (NEYRPIC/GRENOBLE - FRANCE).

Basic and detailed design, equipment supply, panel manufacturing, civil work, erection,test and commissioning of 154/31,5 kV, 1x25 MVA substation on turn-key basis.

Electrical Erection, test and commissioning support of control, metering and protective equipment for power plant including all equipment for intermediate switchyard.

Electrical Automation of Power House Draining System including design, material supply and installation works and manufacturing of electrical panels.

High Voltage Primary & Secondary, Control / Protection / Metering Design of a New 154 kV Substation.

  • Client: ÇEAŞ
  • Place : OSMANİYE
  • Date: 2001
© 2022 GES Genel Elektrik Sistemleri Yapım ve Mühendislik A.Ş