PAMUKOVA HEPP (3x3,5 MW)

PAMUKOVA HEPP (3x3,5 MW)

Mechanical Erection of electromechanical equipment consisting turbine, gear box, generator, hydraulic governor, cooling water system.

  • Client: EMT / SULZER HYDRO
  • Place: BİLECİK
  • Date: 2000
© 2022 GES Genel Elektrik Sistemleri Yapım ve Mühendislik A.Ş