ARKUN HEPP (3x76,6 MVA) MAIN PLANT

ARKUN HEPP (3x76,6 MVA) MAIN PLANT

Mechanical erection,test and commissioning support of generators (3x76,6  MVA), three vertical francis turbines, three inlet valves and related BOP & auxiliaries. Scope includes also design, equipment supply, erection and commissioning of complete Mechanical BOP

Electrical basic and detailed design, equipment supply, panel manufacturing, erection, test and commissioning of electrical LV and MV BOP & Protection & 380kV switchyard (Including switchyard civil work) on turnkey basis.

Other Works in the Scope of This Project

Basic and detailed design, equipment supply, panel manufacturing, erection, test and commissioning of 3 x 100 MVA  13,8/380 kV transformers and 2 Nos 380 kV Feeder.

Basic and detailed design, equipment supply, erection, test and commissioning of  1500 m 1x630 mm2, 380/220 kV high voltage cable.

Mechanical Design of LP Compressed Air System, Cooling Water System, Drainage&Dewatering Systems.

  • Client: ENERJİSA
  • Place : ARTVİN
  • Date: 2014