CEVİZLİK HEPP (2x50 MW)

CEVİZLİK HEPP (2x50 MW)

Mechanical erection, test and commissioning support of two (2x50 MVA) generators, two turbines, two inlet valves and related BOP & auxiliaries.

Other Works in the Scope of This Project

Mechanical Manufacturing of two draft tube elbow and two discharge cones.

Mechanical Supply of manpower and tools for main revision and controls.

  • Client: ALSTOM
  • Place : RİZE
  • Date: 2009
© 2022 GES Genel Elektrik Sistemleri Yapım ve Mühendislik A.Ş