KARGILIK HEPP (2x15 MVA)

KARGILIK HEPP (2x15 MVA)

Basic and detailed design, equipment supply, panel manufacturing, erection, test and commissioning of 11/154 2 x 15 MVA Switchyard.

High Voltage Primary Secondary, Control / Protection / Metering Design of a New 154 kV SUBSTATION for Kargılık HEPP.

  • Client: TEKTUĞ ENERJİ
  • Place: KAHRAMANMARAŞ
  • Date: 2004
© 2022 GES Genel Elektrik Sistemleri Yapım ve Mühendislik A.Ş