Erection of Electrical LV BOP & Protection & 220kV High Voltage Power Cables on Turnkey Basis.
Mechanical Erection,Test and Commissioning Support of Generators (2x104,5 MVA + 1x1,4MVA), Two Vertical Francis Turbines, One Horizantal Francis Turbines & Three Inlet Valves and Related BOP & Auxiliaries, two 105 MVA Step-up Transformers, one 1,6 MVA Step-up Transformer, 220kV Gas Insulated Switchgear and MV BOP.