380 kV switchyard equipments and transmission line between PH and Switchyard installation, 3x201,8MW and 1x20,64MW power transformers installation, oil filling and treatment, Units IPB installation, MV connections, station service equipments, diesel generator, UPS, power and control cables installation, Unit control and 380 kV switchyard control systems, signalling systems, unit protection systems ve measuring equipments installation.Mechanical installation, test and commissioning support of one generator (30,64 MVA) ve one vertical Francis turbine and auxiliaries (cooling and lubrication equipment and piping lines)