UYGAR WIND POWER PLANT 250 MW 400kV SUBSTATION

UYGAR WIND POWER PLANT 250 MW 400kV SUBSTATION

400 kV Main Substation and Switch Substation: Basic and Detailed Design, Equipment Supply, IEC 61850 based Automation system, Civil Work, Erection, Test and Commissioning of 8 pcs of 400 kV Feeders and 14 pcs of 33 kV Feeders to be completed on turn-key basis.


400 kV Switch Substation: Basic and Detailed Design, Equipment Supply, IEC 61850 based Automation system, Civil Work, Erection, Test and Commissioning of 1 pcs of 400 kV Feeders and 16 pcs of 33 kV Feeders to be completed on turn-key basis.

  • Client: ENERJİSA
  • Place: İZMİR
  • Date: 2024
© 2022 GES Genel Elektrik Sistemleri Yapım ve Mühendislik A.Ş