ZORLU ENERJİ KAYSERİ CCPP (155 MW)

Basic and detailed design, equipment supply, panel manufacturing, civil work, erection, test and commissioning of 154/34.5 kV 2 x 125 MVA; 11/154 4 x 60 MVA Switchyard and 1,2 km, 154 kV 2x(3x795) MCM OHL on turn-key basis.
  • Client: ZORLU ENERJİ
  • Place: KAYSERİ
  • Date: 2004