Supply of Turbine, Generator And Auxiliary Equipments Mechanical erection, test and commissioning support of generators (2x6,65 MVA), two horizontal francis turbines, two inlet valves and related BOP & auxiliaries Scope includes also design, equipment supply, erection and commissioning of complete Mechanical BOP
Electrical basic and detailed design, equipment supply, panel manufacturing, erection, test and commissioning of electrical LV and MV BOP & Protection on turnkey basis.
Other Works in the Scope of This Project
Basic and detailed design, equipment supply, panel manufacturing, erection, test and commissioning of 3 x 100 MVA 13,8/380 kV transformers and 2 Nos 380 kV Feeder.
Basic and detailed design, equipment supply, erection, test and commissioning of 1500 m 1x630 mm2, 380/220 kV high voltage cable.
Mechanical Design of LP Compressed Air System, Cooling Water System, Drainage&Dewatering Systems.